finishing Flat 200 meters Super Lux

finishing Flat 200 meters Super Lux

Specifications Flat finishing 200 meters Super Lux
Flat finishing specifications  Apartment finishing 200 meters

Electricity finishing works
Comprehensive finishing of electrical wires 3 mm, the Swedish company accredited
1.5 mm power cord, Al Suwaidi approved company
Finishing 10 shower points – Finishing 10 phone points – Finishing adaptations connections
Finishing washer connections + intercom finishing
Finishing and installing a 18-line keyboard – Finishing and installing circuit breakers – Finishing and installing a triple circuit  breaker 63 ampere
Finishing, including manufactures and finances
Finishes, including 6 mm electrical wires, Al-Suwaidi accredited company
All electric finishing wire 4 mm, Al Suwaidi accredited company
Finishing pipes 16 mm Mostafa Mahmoud approved
Finishing and installing cans certified
Finishing and establishing sanitary clause
Finishing, including 20 mm German BBR feeding tubes, 20 years guarantee
Finishing, including drainage pipes, 50 mm, Al Sharif company, 20 years guarantee
Finishing a drainage line for terraces
Finishing includes workmanship, finishing, forging and the necessary item
The item of finishing ceramic floors and walls for the capital company for finishes in Egypt, decoration and general  contracting
Finishing, including the supply and installation of ceramic wall tiles
Finishing, including the supply and installation of porcelain and floors
Finishing includes workmanship, finishing, forging and the necessary item
The ceramic finishing item should not exceed the purchase of ceramics by 30,000 EGP
Finetech cornice finishing item
Cornice finish for kitchen and bathrooms
Finishing is resistant to heat, moisture and fire from the certified Futech company
The item for finishing paints and decoration does not exceed 100 mm for the finishing company in Egypt, decoration and general contracting
Finishing, including paint works, SLR, of all units
Finishing three faces paste
Liner face finish – 2 finished side finish
Finishing for all types of materials, KFH company
Finishing includes workmanship, finishing, forging and the necessary item
Item finishing the internal doors of the unit
Finishing the doors, including 5 doors
Finishing and installation of musky door Arrow veneer
Finishing door paints, stretch or glossy lines
The door finishing item includes workmanship, finishing, and forging the necessary item
Finishing and installing bathroom sets for finishing company in Egypt, decoration and general contracting
It includes finishes, supplying and installing bathroom sets
The number is 2 supplying and finishing bases
The number 2 bath tub supply and finishing
The number 1 supply and finishing builder
The number 1 kitchen sink, supply and installation
Finished bathroom kits include workmanship, finishing, and forging and the necessary item
Mixers finishing item for the capital company
Comprehensive finishing, supply, installation and testing of all mixtures
The mixers finishing item includes workmanship, finishing and the necessary item
Marble finishing item for interior doors and kitchen and accessories item for the capital finishing company
Marble finishing item includes the supply and installation of granite type marble works
Marble and granite finishing includes the installation of accessories for bathrooms and kitchen
The item for marble and granite finishing includes workmanship, finishing, forging and the necessary item
Finishing item, Gibson Board Walls for a company
Supply, installation and finishing of not more than 40 mm
Finishing item, Gibson Board, the Bishop of the Egyptian Capital Finishing Company, decoration and general contracting
Supply, installation and finishing provided that it does not exceed 70 mm

www.facebook.com

Super Deluxe Finishes Decor And Finishing Company In Egypt INTERIOR DESIGN

تشطيب شقة سوبر لوكس
تشطيب شقة سوبر لوكس